Tasks
Task 1.0: Project Set Up
This task includes developing a Field Safety Checklist and the Lab Binder in order to access the site and NAU laboratories.
Task 1.1: Field Safety Checklist
A Field and Safety Checklist is required by NAU for travel to the site.
Task 1.2: Lab Binder
A lab binder is required to document laboratory methods used for the project.
Task 2.0: Research
Research will be conducted to identify appropriate solidification materials, tailings/binder mix ratios, how to create cylinders for compression testing, compression testing, and TCLP/SLP testing.
Task 2.1: Solidification Materials
Appropriate mix materials and ratios will be identified for each binder material, as well as how to create test cylinders for strength testing.
Task 2.2: Strength Tests
The compression test and tensile test are strength tests that will be researched.
Task 2.3: Leachability Tests
EPA Method 1312: Synthetic Precipitation Leaching Procedure (SPLP) and EPA Method 1311: Toxicity Characteristic Leaching Procedure (TCLP) are the two leachability tests that will be considered so that an appropriate test can be selected.
Task 3.0 Experimental Design
An experimental matrix detailing how the required parameters will be varied in the experiments will be developed.
Task 4.0 Materials Procurement
Experimental materials will be obtained in this task.
Task 4.1: Obtain Tailings
A site visit will be made to collect the required amount of tailings from each site.
Task 4.2: Obtain Solidification Materials
Suppliers will be identified, and materials will be ordered from the chosen supplier.
Task 5.0 Test Cylinder Creation
In order to perform strength testing, test cylinders of solidified tailings will be created according to procedures identified in Task 2.2. Cylinders will need to cure for approximately 28 days. Access to the NAU Civil Engineering Concrete Laboratory will be obtained to pour and cure the cylinders.
Task 6.0: Experimentation
The cylinders will be tested after they are fully cured through strength testing and leachability testing.
Task 6.1: Strength Testing
Strength testing includes both a compressibility test which tests the cylinder along its axis and tensile test which tests the cylinder along its radius.
Task 6.2: Leachability Testing
Leachability testing will be conducted according to the experimental matrix and will include either the TCLP or the/SPLP test as determined in Task 3.0.
Task 7.0: Data Analysis
Results from the strength testing and leachability tests have been and are being analyzed to determine performance of the solidified materials.
The strength testing data is presented in the following table:
Task 8.0: Project Impacts
Environmental, social, and economic impacts of the project will be evaluated and discussed.
Task 9.0: Project Deliverables
This task details the deliverables.
Task 9.1: 30% Deliverables
The 30% deliverables include a 30% Report and Presentation. Tasks 1-4 and all subtasks will be completed as the 30% milestone. The expected due date is Sep 30, 2022.
Task 9.2: 60% Deliverables
The 60% deliverables include a 60% Report and Presentation. Tasks 5-6 and all subtasks will be completed as the 60% milestone. The expected due date is Oct 28, 2022.
Task 9.3: 90% Deliverables
The 90% deliverables include a 90% Report and website (will not be made public). Tasks 7-8 and all subtasks will be completed as the 90% milestone. The expected due date
is Dec 2, 2022.
Task 9.4: Final Deliverables
The final deliverables consist of a Final Report, Presentation, and Website. The due date
is Dec 13, 2022.
Task 10.0: Project Management
Project Management will include regular meetings, communication, and scheduling to stay on track for completion of this project.
Task 10.1: Meetings
A Meeting Memo Binder documenting all team, client, grading instructor and technical advisor meetings will be created.
Task 10.2: Schedule Management
The schedule will be tracked so that the project progresses in a timely manner required for completion.
Task 10.3: Resource Management
Resource management, including staff time, supplies and the budget will be tracked during the project to assure the project is completed within budget.