Problem Definition
n The goal of the project is to provide savings for the plant by reducing energy costs and improving efficiency in the steam system.

Client Need statements

Efficiency improvement calculations for the plant boilers.

Research and application of recent technological improvements.
Design of a combustion air preheater

Our Design Plan

Conduct state of the art research

Take thermal and size measurements on site 

Use heat transfer equations to optimize our design setup

Build a CAD model

Choose materials and construction methods.

 

PICTURES OF CURRENT BOILER