Cost of construction for this design was determined through costs of equipment, installation, operations, and maintenance. The costs in the table below were estimated using averages of typical commerical costs. The costs of the pipe network transporting water from the facility to the wetland and from the wetland to the sewer are included in the Phase II design costs. The piping costs are estimated costs based on approximate pipe lenghs and do not account for utility relocation and inspection.