 10/11/2019    Made team by-laws and plans   Team Contract.pdf
 11/15/2019    Presented three prototypes   Prototype Findings.pdf, Prototype 1.zip,
Prototype 2.zip, Prototype 3.zip
 11/20/2019    Meeting with clients    
 12/02/2019    Made Work Breakdown Structures   WBS and Feasibility Planning.pdf
 12/12/2019    Made Design Review 2 report   AmpEd Design Review 2.pdf
 01/23/2020    Made Schedule Presentation   AmpEd Schedule Presentation.pptx
 03/06/2020    Made Design Review 3 presentation   AmpEd DR3 Presentation.pptx
 04/03/2020    Made Design Review 3 report   AmpEd Design Review 3.pdf
 04/17/2020    Submitted UGrads Poster   AmpEd Poster.pdf
 05/01/2020    Made Design Review 4 presentation   AmpEd Final Presentation.pptx
 05/07/2020    Made Design Review 4 report/User Manual   AmpEd Design Review 4 and User Manual.pdf