Here is a timeline, with key milestones and documentation for our project:
Date | Description | Documents | ||
---|---|---|---|---|
10/11/2019 | Made team by-laws and plans | Team Contract.pdf | ||
11/15/2019 | Presented three prototypes | Prototype Findings.pdf, Prototype 1.zip, Prototype 2.zip, Prototype 3.zip |
||
11/20/2019 | Meeting with clients | |||
12/02/2019 | Made Work Breakdown Structures | WBS and Feasibility Planning.pdf | ||
12/12/2019 | Made Design Review 2 report | AmpEd Design Review 2.pdf | ||
01/23/2020 | Made Schedule Presentation | AmpEd Schedule Presentation.pptx | ||
03/06/2020 | Made Design Review 3 presentation | AmpEd DR3 Presentation.pptx | ||
04/03/2020 | Made Design Review 3 report | AmpEd Design Review 3.pdf | ||
04/17/2020 | Submitted UGrads Poster | AmpEd Poster.pdf | ||
05/01/2020 | Made Design Review 4 presentation | AmpEd Final Presentation.pptx | ||
05/07/2020 | Made Design Review 4 report/User Manual | AmpEd Design Review 4 and User Manual.pdf |