DELIVERABLE |
DUE DATE |
---|---|
Team Inventory | 09/21/17 |
Team Standard | 09/21/17 |
Mini Intro | 10/03/17 |
Technological Feasibility | 11/06/17 |
Design Review 1 | 11/20/17 |
Requirements Document | 12/04/17 |
Design Document | 02/08/18 |
Software Testing Plan | 04/03/18 |
UGRADS Presentation | 04/27/18 |
UGRADS Poster | 04/27/18 |
This page contains all team deliverables created over the course of Capstone 2017. These documents vary and reflect various standards and milestones for Nimbus Technology. Each row in the table above represents a completed deliverable. Each deliverable contains a title, due date, and a physical copy of the document. Clicking the deliverable hyperlink will open the document in your browser.