The future design flow is calculated for the existing and future structures in Page's industrial area. The link below shows the calculations.
Flow DesignAutoCAD Civil 3D is utilized to determine the layout of the sewer network. The design follows City of Page design standards.
Sewer NetworkThe sanitary sewer design will implement two manholes that taps into an existing manhole and connected by 12-inch SDR-35 PVC pipe. A 4-inch sewer lateral connects to the project property proposed structure.
ProfilesFrom the elevation data provided from the sewer design, the velocity for the sewer pipe networks can be calculated. The calculated velocities are within standards set by Page.
Hydraulics