Our pipe network will tie in at manhole 2 and continue to the Heating and Cooling Plant, were the stormwater will be treated and discharged into the remote sump. The overall system design will be pressurized, therefore the stormwater will be conveyed and treated without opening to the atmosphere until being discharged into the remote sump. Figure below indicates the direction of flow and the tie in point for the pipe network.