Overall, the final design started from the bottom of manhole number two to conveying the water to the Heating and Cooling Plant through a water treatment system inside Room 144, then to the remote sump. The design included two pumps in parallel to convey the water through a pressurized pipe all the way to the remote sump. The design included nine fittings, two valves, one pressurized sand filter, one calcite-corosex blend neutralizer, and about 300 feet of C900 PVC piping.
Total Pipe Length: 288 feet
Diameter of Pipe: 4 inches
Pump Model: EBARA Pump Model 50DSH61.5 (2HP)-2 pumps in parallel
Water Treatment System Components: Calcite & Calcite-Corosex Blend Neutralizers and Pressurized Sand Filtration