Final Design

Northern Arizona University, Flagstaff, AZ.

Final Design

Overall, the final design started from the bottom of manhole number two to conveying the water to the Heating and Cooling Plant through a water treatment system inside Room 144, then to the remote sump. The design included two pumps in parallel to convey the water through a pressurized pipe all the way to the remote sump. The design included nine fittings, two valves, one pressurized sand filter, one calcite-corosex blend neutralizer, and about 300 feet of C900 PVC piping.

Total Pipe Length: 288 feet

Diameter of Pipe: 4 inches

Pump Model: EBARA Pump Model 50DSH61.5 (2HP)-2 pumps in parallel

Water Treatment System Components: Calcite & Calcite-Corosex Blend Neutralizers and Pressurized Sand Filtration