Grading PLan
As per client request the first stage of the project was to develop a grading and drainage plan for the Community Park site.
moreIrrigation, drinking,
and waste water
This task is composed of irrigation, sewer, storm drains, potable water, and well drilling. There is no development on the site so our task would be to develop the best possible locations for each of the utilities.
moreRoadway
Design
A proposal of one-fifth a mile roadway design which is off of Highway 260 will contain the following perimeters: horizontal and vertical alignment subtasks, cross sections, roadside design concepts, and drainage systems.
more