Proposal

As per the the requirements of the Capstone course. The CENE 476 proposal for the project can be found here.

more

Final Report

The Teams final report can be found here.

more

References

A page of refrences that the team used during the project are located here for easy refrence.

more

Grading PLan

As per client request the first stage of the project was to develop a grading and drainage plan for the Community Park site.

more

Irrigation, drinking,
and waste water

This task is composed of irrigation, sewer, storm drains, potable water, and well drilling. There is no development on the site so our task would be to develop the best possible locations for each of the utilities.

more

Roadway
Design

A proposal of one-fifth a mile roadway design which is off of Highway 260 will contain the following perimeters: horizontal and vertical alignment subtasks, cross sections, roadside design concepts, and drainage systems.

more
 
Free Website Templates by ThemesLine.comMuzica Noua