Spectral Forest
Presentation 1
Presentation 2
Presentation 3
Prototype Presentation 1
Prototype Presentation 2
33% Hardware Update
67% Hardware Update
100% Hardware Update
Initial Testing Results
Final Testing Results
UGRADS Presentation
Report 1
Report 2
Project Management 12/8/23
Project Management 1/19/24
Engineering Model Report
Finalized Testing Plan
Final CAD PDF
Final Report
Operation Manual
Client Handoff File
UGRADS Poster