As part of our project, we will regularly publish our reports, presentations, and other deliverables here.
Presentation delivered by the team on the progress of the prototype. Accompanied by a live demo of the prototype.
DownloadA memo created by the team to determine what calculations each member will perform in order to further the project as a whole.
DownloadThe team's first consolidated report on the progress of the project, containing all calculations, literature review, benchmarking, design concepts, and mathematical modeling.
DownloadThe team's second consolidated report on the progress of the project, containing all updated calculations, literature reviews, CAD modeling, scheduling, budget, bill of materials, design validation and initial prototyping.
DownloadThe final bill of materials regarding the second prototype assembled by the team for the first semester of work.
DownloadSecond presentation delivered by the team on the progress of the prototype. Accompanied by a live demo of the second prototype.
DownloadProject management memo by the team to set the project up for success during the second semester.
DownloadSecond project management memo by the team to set the project up for success during the second semester.
DownloadA summary of all engineering calculations performed by the team for the project, as well as any applicable regulations and standards to the project.
DownloadThis was presented as an update to where the team was at with parts ordering, manufacturing, and finalized design modifications.
DownloadThis was presented as an update to the client at Northrop Grumman where the team was at with parts ordering, manufacturing, critical design efforts and finalized design modifications.
DownloadThis is the team's finalized testing plan for the fully assembled robot arm. This plan was completed by Mason Goodman and Daniel Cooke.
DownloadThis was presented as the final update to the instructor and class at to where the team was at with parts ordering, manufacturing, critical design efforts and finalized design modifications. This presentation specifically showed the fully assembled product.
DownloadThis presentation displayed the team's initial testing results from the first few tests performed on the product.
DownloadThis poster was the one used by the team at both their UGRADS presentation at NAU and during their client presentation at Northrop Grumman in Chandler, AZ. It contains basic information on the summary of the project, engineering requirements, testing results, and some major references used by the team.
DownloadThis is the team's final presentation on the project, containing information on the project's beginnings, design decisions, and final efforts, as well as final updates on the Gantt chart, BOM, and manufacturing tables.
DownloadThis was presented as an update to the client at Northrop Grumman where the team was at with parts ordering, manufacturing, critical design efforts and finalized design modifications.
DownloadThis was presented as an update to the client at Northrop Grumman where the team was at with parts ordering, manufacturing, critical design efforts and finalized design modifications.
DownloadThis is the team's finalized set of testing results. All tests were completed succesfully and those results are detailed in this presentation.
DownloadThis is the team's final report. It contains all finalized calculations, design efforts, documentation on design choices, mathematical modeling, and finalized product assembly.
DownloadThis is the team's final Gantt chart. It contains all finalized tasks at the time of posting on 4/23/24.