HDRM Capstone Spring 2022

Reports

Main Content

   Team Charter

   Introduces team and assigns roles - Complete 1.18.22 

   PDR -Preliminary Report

   Introduces problem, design and begins selection process - Complete 3.20.22   

   CDR - Final Proposal

   Refines problem, presents prototype, design justification and validation and steps moving forward - Complete 4.16.22    

   Technical Analysis: Lock Analysis - Nathan Olson

   Presents a force analysis on the ball-lock mechanism in the final design - leads to geometric optimization and spring selection for final model - Complete 3.20.22           

   Final Report

   Final Report compiling work from both semesters - Complete 12.4.22 

   Owner's Operation/Assembly Manual

   Document outlining assembly, disassembly, operation, maintenance and troubleshooting of the final product. - Complete 12.11.22