Presentation 1

The first presentation evaluates the project description and preliminary requirements. The customer needs, engineering requirements and house of quality are included. Downlaod presentation 1 to get a good baseline of the Ski Haus tow rope project.

Presentation 2

Presentation 2 analyzes possible concepts for the design from a blackbox model to a descision matrix. This presentation focused on the functionality of the tow rope and those relations to the customer needs. Download presentation 2 for a look at preliminary design concepts.

Preliminary report

Our preliminary report discusses all research, benchmarking, and concept generation through october 15, 2021. Download the preliminary repoirt for a detailed description of the Ski Haus tow rope project thus far.