Showing the brake system from early stage and progressing to final working component. Final working video can be found here: Brake Test 4-1-16
Below is the final construction of the Rectifer. This component is used to converd AC current to DC current
Below is the chosen converter used to regulate the output voltage of the turbine going into the load
Below is the Bomus Load, this load represents the link between the tunnel team and the deployment team