Concept Generation, Planning and Proposal Stage
Activities:
- Weekly meetings with Faculty Mentor and Client
- Client Proposal
- Design Presentation
- Research:
-
- Boost Converters
- Hysteresis Control
- Company Survey and Industry Search
- PI Controller
- Maximum Power Point Tracking
- Optimal Tip Speed Ratio
- Boost Converter Control Schemes
- Switching States
Milestones:
- Complete Single Channel Boost Converter with Classical Control Simulation
- Draft Preliminary design
- Client Proposal - Comprehensive report detailing progress made by team during current stage. Submitted to client on December 1, 2016.
- Design Presentation - Presented on December 5, 2016 to update class on progression of capstone project.
Tools:
- Matlab/Simulink Software to produce and test simulations
Design Decisions:
- Three Channel Boost Converter
Design Work:
- Single Channel Boost Converter with Classical Control Simulation
Testing:
- None
Challenges:
- Completing simulations
- Balancing Faculty Mentor and Client expectations