Deliverable |
Description |
Due Date |
Deliverable Link |
Team Standards |
The purpose of this document is to make a team contract.
This document will name our team members and define their roles,
expectations for team meetings, and methods for creating and reviewing
team documents. It will also decide what tools and technologies our team
will use and determine how often team reviews will take place. |
9/26/18 |
click here |
Team Inventory |
The purpose of this document is to introduce our team. Each
page gives a summary of one team member including education
history, relevant experience, and personal interests. |
9/26/18 |
click here |
Mini-Intro |
The purpose of this mini-intro is to talk about our sponsor,
the problem our sponsor has, a solution to the problem, and
a tentative features list. |
10/2/18 |
click here |
Technological Feasibility |
This document covers the initial technologies involved in creating our
application and comparing them to various alternatives. |
11/7/18 |
click here |
Design Review Presentation 1 |
The purpose of this design review presentation is to discuss about
our sponsor, problem statement, solution overview, key requirements,
risk and feasibility, and schedule. |
11/20/18 |
click here |
Requirements Specification Document |
This document is a contract with our sponsor, entailing features that will be
in the application and future features later on. |
12/5/18 |
click here |
Software Design Document |
This document is an overview of how we plan to implement and design
our project. Detailed descriptions and UML diagrams are included for the modules and
interfaces as guidelines. |
2/19/19 |
click here |
Design Review Presentation 2 |
The purpose of this design review presentation is to discuss about our sponsor,
problem statement, solution overview, key requirements, risk and feasibility,
schedule, implementation overview, and architecture overview. |
2/28/19 |
click here |
Software Testing Plan |
This document overviews our plans utilizing unit testing, integration testing,
and usability testing for both the application and web portal. |
4/4/19 |
click here |
Design Review Presentation 3 |
The purpose of this design review presentation is to discuss about our sponsor,
problem statement, solution overview, key requirements, risk and feasibility,
schedule, implementation overview, architecture overview, and testing plan. |
4/11/19 |
click here |
UGRADS Presentation |
The purpose of the UGRADS presentation is to give an overview of our year long project. |
4/26/19 |
click here |
UGRADS Poster |
This is the poster we presented at UGRADS. |
4/26/19 |
click here |
User Manual |
This document gives detailed instructions on how to install, administer, and maintain our software. |
5/2/19 |
click here |
Final Report |
This document gives an overview of our development process when working on this project. |
5/10/19 |
click here |