SHADOW MOUNTAIN
COST OF DESIGN
DESCRIPTION
The final cost of design is broken down into excavation, material, and construction cost.
When
May 2023
Who
Sydney Wilson, Carleigh Jones, Shanya Whitehorse
COST OF DESIGN
The bioswales cost around $20,010 and the check dams cost around $3,726. As a result, the total cost of construction was $33,290. In addition to construction cost, the cost of engineering services was $100,329.

EXCAVATION COSTS


MATERIAL COST


INSTALLATION COST


COST OF ENGINEERING SERVICES