Project Constraints

Project Constraints

  • A natural stream should be able to migrate laterally and longitudinally down the valley.

  • It should be able to hydraulically connect with floodplains.

  • Natural vegetation should line its bank.

  • Stream velocities should be reduced below the velocities where erosion would occur.

  • There should be no design affect to the existing FUTS trail.