Obtain the topograyphy and geotechincia information realted to the dewey site.
Task 1.1 Existing Topography
Task 1.2 Geotechnical Analysis
Using rational method to analysis the runoff volume and time of concentration in both pre-development and post-developement conditions.
Task 2.1 Pre-Development Runoff
Task 2.2 Post-Development Runoff
Designed the culvert under the driveway and make a decision matrix of the pipe materials.
Task 3.1 Existing Condition for Culvert
Task 3.2 Culvert Modifications
Grading, cut/fill plan, and outlet protections around the dewey site.
Produce a plot plan, site plan, and grading & drainage sheets. The cross-section profiles should include the driveway, house pad, and the parking area.
Analysis the impacts in various aspects after the construction. Estimated the engineering service costs, and the construction costs.
Task 6.1 Social Impacts
Task 6.2 Economic Impacts
Task 6.3 Environmental Impacts
Task 6.4 Cost of Implementing Design
These deliverables are necessary for QA/QC. They shall be reviewed by peers and JHA to ensure the project is on schedule and being completed properly.
Task 7.1 30% Deleverable
Task 7.2 60% Deliverable
Task 7.3 90% Deliverable
Task 7.4 Final Deliverable
Project management can ensure the project kept on track and provided a efficient work.
Task 8.1: Project Meetings
Task 8.2: Schedule Management
Task 8.3: Resource Management