Final Proposal

The is the final proposal that was submitted before the sampling event and analysis of the compost. This document covers the project understanding, scope, staffing plan, and cost of engineering services.

Proposed Presentation

This document shows the proposed presentation which covers the same materials that are covered in the final proposal for CENE 476. Which are scope, staffing plan, cost of engineering services, and project understanding.

Final Report

This document is consisted of final results of the analysis, summary of engineering work, summary cost, sampling plan, operation analysis, regulations, and workplan.

Final Presentation

This is the final presentation of the project which shows the sampling plan, results of analysis, cost, staffing hours, impacts, etc.