Project Timeline
The picture above is a gnatt chart of the project with a list of the task to complete for the final design along with there respective due dates. The table you see below is the schedule from the gnatt chart.
The picture above is a gnatt chart of the project with a list of the task to complete for the final design along with there respective due dates. The table you see below is the schedule from the gnatt chart.
1 |
Data Collection |
Fri 9/4/15 |
Tue 11/3/15 |
1.1 |
Site Evaluation |
Fri 9/4/15 |
Thu 9/10/15 |
1.2 |
Topographic Survey |
Fri 9/11/15 |
Mon 9/14/15 |
1.3 |
Client Meeting |
Tue 11/3/15 |
Tue 11/3/15 |
2 |
Roadway Design Guidelines |
Mon 11/2/15 |
Fri 12/11/15 |
2.1 |
Research guidelines |
Mon 11/2/15 |
Fri 11/6/15 |
3 |
Data Analysis |
Mon 11/2/15 |
Fri 3/4/16 |
3.1 |
Survey Data |
Tue 11/3/15 |
Tue 11/3/15 |
3.2 |
Traffic Statistics |
Wed 11/4/15 |
Tue 11/10/15 |
3.3 |
Level of Service: TWSC |
Thu 11/12/15 |
Wed 11/18/15 |
3.4 |
LOS: Roundabout |
Mon 2/22/16 |
Fri 3/4/16 |
4 |
Site Design |
Tue 1/19/16 |
Fri 3/4/16 |
4.1 |
Roundabout |
Tue 1/19/16 |
Mon 2/29/16 |
4.1.1 |
Geometry |
Tue 1/19/16 |
Sun 2/21/16 |
4.1.2 |
Grading |
Tue 2/9/16 |
Sun 2/21/16 |
4.1.3 |
Striping |
Mon 2/22/16 |
Thu 3/11/16 |
4.1.4 |
Signage |
Fri 2/26/16 |
Mon 3/11/16 |
4.2 |
Site Development |
Mon 1/25/16 |
Fri 2/26/16 |
4.2.1 |
Drainage |
Mon 2/29/16 |
Fri 3/25/16 |
4.2.2 |
Landscaping |
Sat 2/29/16 |
Wed 3/25/16 |
4.2.3 |
Pedestrian Consideration |
Thu 3/10/16 |
Thu 3/25/16 |
5 |
Economics |
Mon 2/29/16 |
Fri 4/1/16 |
5.1 |
Construction Costs |
Mon 3/5/16 |
Wed 4/1/16 |
5.2 |
Benefits |
Mon 3/7/16 |
Fri 4/1/16 |
5.3 |
Impacts |
Mon 3/21/16 |
Fri 4/1/16 |
6 |
Project Management |
Tue 10/27/15 |
Thu 5/12/16 |
6.1 |
Project Schedule |
Mon 11/16/15 |
Fri 11/20/15 |
6.2 |
50% Design Report |
Fri 3/11/16 |
Fri 3/11/16 |
6.3 |
Final Design Report |
Fri 4/29/16 |
Thu 5/12/16 |
6.4 |
Final Presentation |
Fri 4/29/16 |
Fri 4/29/16 |
6.5 |
Website |
Mon 11/23/15 |
Fri 12/4/15 |
Item | Start Date | Finished Date |
Data Collection | 9/10/2015 | 11/17/2015 |
Data Analysis | 11/3/2015 | 4/2/2016 |
Site Design | 2/21/2016 | 4/15/2016 |
Site Development | 3/25/2016 | 4/1/2016 |
50% Design Report | 3/11/2016 | 3/11/2016 |
Final Report/ Presentation | 4/29/2016 | 4/29/2016 |