Flagstaff Traffic Roundabout
The city of Flagstaff has delegated the task of redesigning the Old walnut Canyon Road / Oakmont Drive and Country Club Drive intersection. The objective of the project is to evaluate, and redesign the intersection. This project is a budgeted project by the City of Flagstaff Capital improvement program for the year of 2018-2019. The intersection is two-way stop controlled in both of the east and west directions. The sight distance in the intersection is poor because of large grades on the southern part. There are multiple technical aspects which need to be taken in consideration when redesigning the intersection which include, the location of the intersection, the advantages and disadvantages of the possible design options, the cost of the different design alternatives, the collected traffic data, and safety analysis.