background

 

Clover Springs Project

The Clover Springs Project was restored in 2001 by the US Forest Service. The stream channel was restored to eliminate headcutting as well as to increase water quality by decreasing turbidity.

The JDM Engineering team is providing a post treatment analysis of the design as well as redesigning stream sections that have become impaired again.

The image below shows work the Forest Service did in 2001.

Estimated Project Costs

With Travel Costs Estimated to Cost $78,522 for engineering services and design implimentation.

Estimated Timeline of Critical Paths