Schedule

Schedule as of April 30, 2014

Proposed Schedule, December 2, 2013
*The red line on the proposed schedule indicates the critical path for the project

 

Total Project Costs, April 2014

Detailed Costs for Materials and Analytical Laboratory Tests

Proposed Cost Estimate for Engineering Services, December 2013