Project Information Page

Project Location

This project takes place in Flagstaff, Arizona.

Project Constraints

The list of customer requirements implies system that can be transported easily, has a large Lego capacity and sports intuitive operation having minimum interaction time. The structure must not be made of Legos, should be durable, safe, and should run on standard wall power. Furthermore, the system should sort a wide variety of Legos with high accuracy and should have a quick start time.

Tasks or Gantt Chart

Gantt Chart

Design Alternatives and Decision Matrix

The Design Alternatives and the Decision Matrix can be found here

Details of the Final Design

The details of the Final Design can be found in the Final Report - page 36

CAD Drawings Archive

All current CAD parts, assemblies and drawings are represented here

Bill of Materials

The bill of materials can be found here

Poster

Team 10's Poster is located here