Project Description
The team has been presented with the task to create a universal test fixture for missile flight components such as radomes and leading edges in high temperature and high-pressure flight conditions. The final design must have a quick set up and take down time, with minimal time delay between each step in the process. The team’s client and sponsor, Chuck Vallance, is a former Raytheon employee who has asked us to make changes to the current testing environment either by improving upon the currently existing design or by a redesign using an original concept to increase the efficiency of the testing process.