Within this gallery, updates of our project’s progression can be observed. As work continues on the system, images of our most current design and bill of materials will be displayed at the top of the page. Since the completion of the first semester, the team has spoken with the client and adjusted the overall dimensions of the system. All changes can be noticed by observing the most up to date images and comparing them with the images from last semester.
October 2017: Fabrication Tig Welds
October 2017: Fabrication of 10' Beams
October 2017: Fabrication of 10' Columns
October 2017: Fabrication Layout
October 2017: CAD Models
September 2017: Finite Element Analysis on System
May 2017: CAD Model of Structural Support System
May 2017: CAD Model of Fall Protection System in Laboratory
May 2017: Solid Model Drawing With Dimensions of Support Structure
May 2017: CAD Model of Trolley and Tether Assembly