Project Timeline
The team accoomplished so far a market research for existing markets around the globe, then we selected a market and developed a standared construction requirement to build a turbine for the selected market. After that, the team divided to accomplish a blade design, financial analysis of the turbine, and a generator research and selection. Later, the team will start researching for the structural components for the turbine, and develop a CAD drawing and a Finite Element Analysis (FEA) for the final design.