Timeline

Here is a timeline, with key milestones and documentation for our project:

Date Description  Documents
10/11/2019 Team by-laws and plans
11/20/2019 Prototype
12/05/2019 Work Breakdown Structures (WBS)  
12/12/2019 Design Review 2 Report
01/09/2020 Design Review 2 Presentation 
01/23/2020 Schedule Presentation
03/06/2020 Design Review 3 report
04/03/2020 Design Review 3 presentation
04/17/2020 UGrads Poster
05/01/2020 Design Review 4 presentation
05/07/2020 Design Review 4 report 
05/07/2020 User Manual
05/08/2020 HappyAnimal Matlab simulation (zipped file)