Arizona Public Service has requested a feasibility study to determine if it would be cost effective to replace the excitation systems on generators 1, 2, and 3 with static excitation at the Cholla Power Plant.
A newer system may offer economic benefits through improved system reliability and greater parts availability. Also newer excitation/regulation systems offer enhanced performance and features that may lead to cost savings.
The Team:
Caleb Breazeale
David Bruce
Joseph Davidson
Cholla Power Plant
Poster Session:
We would like to invite everyone to our Poster/Demo Session on April 18th, 2008 from 8:30-11:30 AM. It will be located at the Du Bois center in Room A on NAU's South Campus. For directions please click Here. GPS cordinates: +35° 10' 41.15", -111° 39' 20.82".
Oral Pesentation:
An oral presentation will also be held on the same day (April 18th) at 3:00 PM in the Dui Bois Center's, Agassiz room. Presentation Entitled: "Upgrading Cholla Power Plant for Increased Efficiency."