This page documents our presentations, documents, and other write-ups.
Assignment Name | Due Date | Short Discription | Link to the Document/Presentation |
---|---|---|---|
Team Standards Doc | 9-26 | Outlines the rules and roles our team will follow. | Guidelines For Team Standards.docx |
Team Inventory | 9-26 | Introduces the team members that code GeoLearn. | Team Inventory.docx |
Mini Intro | 9-30 | The first presentation that discusses who the team is, who our sponser is, and the plan for the project. | GeoLearn Mini-Intro.pptx |
Tech Feasibility Analysis | 11-4 | Documents all of the possible technologies we will be using for the project. | Tech Feasibility Final.docx |
Design Review 1 | 11-22 | The following presentation was to talk about the tech requirements for our project. It was reviewed by our peers. | GeoLearn Design Review 1.pptx |
Requirements Document | 12-9 | This is the fully detailed information on the requirements for our project. | Requirements Document.docx |
Communications Memo | 1-13 | This is a brief discussion on how we will communicate with each other for the project. | Team Comm Memo.docx |
Software Design Document | 2-3 | This is the fully designed plan for the web application we are creating. | Software Design Document.docx |
Design Review 2 | 2-28 | The second design review, emphasis on the testing plan and implementation. | Design Review 2 |
Software Testing Plan | 3-27 | The fully detailed plan on how we are testing our application | Software Testing Plan.docx |
UGRADS Poster | 4-19 | A quick walkthrough of project. | Poster |
UGRADS Poster | 4-23 | A quick walkthrough of project. | Final Presentation |