The following table contains all submitted deliverables and presentation PDFs
Document | Description |
---|---|
Inventory | A document that briefly introduces each member of the team. It outlines each members’ training, skills, and relevant experiences. This allows the team and sponsor to gain a comprehensive view of the team’s strengths. |
Standards | A document that outlines team policy, standards, and provides guidelines for team expectations and roles. Sections include: Team Members and Roles, Team Meeting Expectations, Tools and Document Standards, and Team Self-Review. |
Mini Intro | A presentation designed to give an overview of the project, problem, envisioned solution, and outline development plan. |
Teachnology Feasability | A document that outlines the technology feasability for the envisioned product. |
Requirements V1 | A document that outlines the requirements for this project. |
Design Review 1 | A PDF copy of our powerpoint for our first design review. |
Requirements V2 | A client approved revised document that outlines the requirements for this project. |
Signed Requirements V2 | A signed copy of the revised requirements document that outlines the requirements for this project. |
EnginAir Design Review II | A PDF copy of our powerpoint for our second design review. |
Software Design Document v1 | A PDF copy of our software design document. |
Software Design Document v2 | A PDF copy of our software design document - final draft. |
Communication Strategy Memo | A PDF copy of our teams communication strategy outline. |
UGRADS Poster | NAU UGRADS Poster Presentation |
User Manual | User Manual for our software. |
As Built Report | Final as built report. |