Description

The goal of the project is to improve the existing storm drainage system and pedestrian access for parking lot 46 on NAU’s campus. Main objectives are to develop a storm drainage design plan set along with low impact design (LID), improving pedestrian access, by following Americans with Disabilities Act, 1990 (ADA), Universal Design Guidelines, and NAU Masterplan.

Constraints

This project will begin August 23rd, 2021 and conclude November 26th, 2021. The project in contrained by a timeframe of 95 days with 67 working days.

Major Tasks

Task 1: Existing Studies Review

Task 2: Analyze Existing Site

Task 3: Hydrologic Analysis

Task 4: Hydraulic Analysis

Task 5: Site Design

Task 6: Project Deliverables

Task 7: Project Management

 

Location

North of Pine Knoll Drive and South Huffer Lane intersection, between the Rolle Activity Center and the Southwest Forest Science Complex on Northern Arizona University’s campus in Flagstaff, Arizona.

Placeholder image 

Location of Project Site In Reference to Northern Arizona

 

Placeholder imageLocation of Project Site In Reference to NAU's Campus

Placeholder image

Aerial View of Project Site

 

Last Updated 4/26/21