Signal Mill Preliminary Assessment and Site Investigation

Signal Mill is an old stamp mill that operated at the beginning of the twentieth century and is located approximately 69 miles southeast of Kingman, Arizona. The Bureau of Land Management now owns the land where the mill use to be located and has requested a Preliminary Assessment and Site Investigation. The Preliminary Assessment and Site Investigation is the first step in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process and is used to assess threats to human health and the environment.

Client

Eric Zielske is licensed Professional Engineer in the field of Environmental Engineer working for the Bureau of Land Management and is sponosoring the Signal Mill investigation.

Office: 602-417-9223

Fax: 602-417-9223

Email: ezielske@blm.gov

To acess the Bureau of Land Management Webpage click here.

Meet the Team

Angelina Cruse

Major: Environmental Engineering

Email: arc435@nau.edu

Role: Senior Project Engineer, Secretary

Anna Gorman

Major: Environmental Engineering

Email: ag2674@nau.edu

Role: Senior Project Engineer, Project manager

Ali Husain

Major: Environmental Engineering

Email: ah2582@nau.edu

Role: Senior Project Engineer, Quality Assurance and Quality Control Officer

Wyatt La Fave

Major: Environmental Engineering

Email: wkl7@nau.edu

Role: Senior Engineer, Client Contact

Technical Adivsor

Dr. Bridget Bero will aid the team with the project and provide technical advice for the completion of the project.

Email: Bridget.Bero@nau.edu

The views and conclusions contained in this document are those of the authors and should not be interpreted as representing the opinions or policies of the U.S. Government. Mention of trade names or commercial products does not constitute their endorsement by the U.S. Government.