Updated: 5/6/2017

Verde Valley Water Treatment

 

 

Project Details

   

 

Photo Gallery:

Design Construction

Water Contamination

Water Testing

Shipping Samples

The team shipped 64 samples to Dr. Michael Ketterer at MSUD in Denver, CO for a more in depth Arsenic analysis to be completed on our treated samples. Each sample was placed in a 50mL centrifuge tube to be shipped to Colorado.

 

Team Pictures

Final presentation day at UGRADs on April 28th, 2017

 

Team picture on first day of Senior year in August 2016