NAU DRAINAGE PLAN

We contribute all our energy to make the best solution for you.

Capstone Official Webstie of the Water Buffalo Engineering Team

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Purpose

The NAU department of Engineering and inspection has indicated that the Gammage and Eastburn Education buildings are currently experiencing flooding and in need of immediate flood mitigation.  These building sites are susceptible to poor drainage conditions and can consequently suffer moderate flood damage during relatively minor flood events. Accordingly, the drainage plan for the Eastburn Education and Gammage watershed must be analyzed to minimize flood impacts and drain the site area as efficiently as possible. Although the site area lies within the Federal Emergency Management Agency (FEMA) designated floodplain for the Rio De Flag, this drainage study will not include an analysis of the Rio De Flag’s 100-year flood plain. 

NAU Water Buffalo Engineering Team

Client:

NAU Facility Serives, Engineering and Inspection

Technical Advisor:

Wilbert Odem

E-mail: Wilbert.Odem@nau.edu

Phone: 928-523-4449

Team Member:

Name: Connor Klein

E-mail: cjk228@nau.edu

Civil Engineering Major, Undergraduated

 

Name: Yuzhi Zhang

E-mail: yz97@nau.edu

Civil Engineering Major, Undergraduated

 

Name: Yi Yang

E-mail: yy68@nau.edu

Civil Engineering Major, Undergraduated

 

Jiangnan Yi

E-mail: jy293@nau.edu

Civil Engineering Major, Undergraduated