The primary purposes of the capstone project is to protect the current crossing at the project site with the necessary procedures to slow down the rate of scouring that is affecting the foundation and to develop a new crossing that can be built on the site once funds are available. The team will provide the necessary observations, calculations, surveying, and modeling to provide a new crossing design for the residents at the Shangri-La Property Owners Assocation. More information on the project can be found under the "About the Project" tab above.