Current News:
05-08-2006 - Team BILT has completed the ME486C final report, which completes all deliverables for class. To obtain a copy of the report, contact us.
05-01-2006 - Team BILT has completed the Capstone presentation and are now working on the final report.
04-22-2006 - Team BILT has finished the ME 486C Final Design Presentation at NAU, please contact us for a copy if desired. We are now putting the finishing touches on our presentation for the Raytheon presentation.
04-03-2006 - Team BILT is currently finishing dimensioning our mechanical
linkages solution. The initial prototype is expected to be complete on
04-10-2006.
03-19-2006 - Team BILT's design review presentation and report have been
completed and are available. Due to the size of these documents, please
contact us to obtain the desired document.
03-03-2006 - Team BILT has been working on the Design Review Presentation
and Report. When completed, the presentation and report will be uploaded
here.
02-08-2006 - Team BILT has restructured team roles and titles and
can be seen on the team page.
01-23-2006 - Spring '06 schedule update with milestones in schedule page or download here.
12-15-2005 - Links to other NAU 2005/2006 Senior Capstone teams added in links page.
12-09-2005 - Team BILT has completed the Proposal Document and is available.
Due to the size of these document, please contact
us to obtain the desired document.
11-28-2005 - Team BILT has completed the Proposal Presentation and is available. Due to the size of these document, please
contact us to obtain the desired document.
11-27-2005 - Added new link in Links page. And added skills for everyone in Team page.
11-20-2005 - New Problem Statement added to Project page.
|