Posts

Design Review 1

For this project, team TITAN is operating on the core data-collection system for Lowell Observatory’s Astrophysical Ice Lab on NAU campus.

Read more

Tech Feasibility

Introduction …Though these steps are done in effort to solidify the solution methods, it is still valuable to keep the iterative process in mind, as the image of the final product could change radically as the project progresses.

Read more

Mini Intro

Hello from Team Titan! I’m Quinton Jasper, our team lead. Titan consists of 4 developers: myself, Elijah Anakalea-Buckley, Hao Liu and Hui Wan.

Read more

Team Inventory

Introduction The purpose of this document is to provide all parties with a deeper insight of what team TITAN consists of.

Read more

Team Standards

Introduction This Team Standards document will act as a guideline by which all team members will follow.

Read more