Steel Bridge Capstone
Project Summary
Truss-ty Engineering worked to design, construct, and test a scaled steel bridge. This project is one of NAU's Civil Engineering Capstone Projects, as well as part of the ASCE Student Steel Bridge Competition. To complete this project, Truss-ty Engineering designed a 1:10 scaled model of a bridge for Peterson Park that will connect trails over the Skunk River that runs through Story County, Iowa. The bridge was modeled in RISA 3D where the design was tested for stability and deflection. With a design fully developed, the bridge was then fabricated by the team and taken the to the ASCE Steel Bridge Competition where it was loaded, scored, and judged based on time required for construction, weight, and lateral and vertical deflections.
Meet the Team
Alexa Godkin
Civil Engineer
ahg78@nau.edu
Civil Engineering, BS
Kyler Wilkens
Civil Engineer
kzw3@nau.edu
Civil Engineering, BS
Lilly Zelenka
Civil Engineer
lkz5@nau.edu
Civil Engineering, BS
Sydney Juve
Civil Engineer
sej225@nau.edu
Civil Engineering, BS
Client
mark.lamer@nau.edu
Mark Lamer
Technical Advisor
sabrina@siriusstructures.com
Sabrina Gibson