Preliminary Assessment and Site Investigation  Canyon City mill  

...

Canyon city mill 

Completion of a Preliminary Assessment and Site Investigation (PA/SI) report for the Bureau of Land Management (BLM) for the Canyon City Mill site. The site was utilized for milling activities, including a cyanide heap leaching process, that led to the release of hazardous substances. Understanding the extent of the contamination and determining the risk to human and environmental health is imperative in determining if further remedial action is required at the site. The client for this project is  Eric Zielske

Figure 1: Oatman, AZ. By: Reuben Wadsworth, St. George News

  team information 

Chloe Blackhurst: cab847@nau.edu, Environmental Engineering, Staff Engineer and Field Geologist 

Claire Griffiths: cjg445@nau.edu, Environmental Engineering, Staff Engineer

Evan Downs: ejd234@nau.edu, Environmental Engineering, Staff Engineer, HS Officer

Frankie Martinez: fim23@nau.edu, Environmental Engineering, Staff Engineer, QA/QC Officer

Bridget Bero: bridget.bero@nau.edu, Professional Engineer and Technical Advisor