Task 1.1 - Road and Drainage System Conditions Task 1.2 - Flood Conditions
Task 2: Analysis of Previous Studies
Task 2.1 - Review of Museum Fire Task 2.2 - Roadway Data Task 2.3 - Documentation of Existing Structures and Private Property Task 2.4 - Review Existing Stormwater Drainage System
Task 3: Hydrologic Analysis
Task 3.1 - Watershed and Sub-basin Delineation Task 3.2 - Surface Type and Land Use Task 3.3 - Rainfall Task 3.4 - Time of Concentration Task 3.5 - Flow Determination
Task 4: Hydraulic Analysis of Current Design
Task 4.1 - Existing Storm Drainage System - Cross Section Analysis at Steepest Area Task 4.2 - Existing Storm Drainage System - Cross Section Analysis at Flattest Area
Task 5: Drainage Design
Task 5.1 - Propose Storm Drainage Design Task 5.1.1 - Stormwater Drainage Inlet Design Task 5.1.2 - Lateral Plan and Profile Work Task 5.1.3 - Comparison of Design Alternatives Task 5.2 - Drainage System Design Details
Task 7.1 - Final Storm Drainage System - Cross Section Analysis at Steepest Area Task 7.2 - Final Storm Drainage System - Cross Section Analysis at Flattest Area
Task 8: Evaluate Project Impacts
Task 9: Project Deliverables
Task 9.1 - 30% Submittal Task 9.2 - 60% Submittal Task 9.3 - 90% Submittal Task 9.4 - Final Submittal Task 9.4.1 - Final Presentations Task 9.4.2 - Final Plans Task 9.4.3 - Final Report