NAU Parking Lot 46 Drainage Design Capstone Website

 

Placeholder image

 

 

Project Description

Parking lot 46 located on Northern Arizona University's south currently floods during storm events and freezes in the winter. The existing storm drainage system is  not equipped to convey the runoff. The main objective for this project is to develop a storm drainage design construction plan set. The design team has also been asked to improve pedestrian acces surrounding the parking lot.

 

Surf and Turf Engineering Team

...