State Route 64 Passing Lane Preliminary Design
The preliminary passing lane design is conducted to alleviate southbound traffic on State Route 64. The passing lane will begin at mile marker 204 and go to mile marker 201. This design includes analysing the existing conditions of the roadway, conducting a hydraulics and hydrology analysis, passing lane design, traffic control plan, and a cost estimate.
Project Client:
Arizona Department of Transportation - Nate Reisner
Team Information:
Christian Hillebrand - Civil Engineering - Project Manager
Kyle MacPetrie - Civil Engineering - Senior Engineer
Mohammad Ali - Civil Engineering - Drafter
Benjamin Ruth - Civil Engineering - Engineer Step I
Technical Advisor:
Northern Arizona University - Dr. Brendan Russo
Taylor Layland - PE
Date Last Updated: 5/7/2019