Montezuma Castle National Monument Parking Lot Redesign
In recent years, Montezuma Castle National Monument experienced an increase in visitors and vehicle traffic. However, the current parking lot at the Visitor Center does not have enough space to accomodate every vehicle that makes its way there. As such, our team is tasked with redesigning the parking lot in order to make room for as many people as possible, create a central picnic area, and maintain its natural outlook!
Client Information
Richard Goepfrich Jr.
Occupation: Facility Manager at Montezuma Castle National Monument
Primary Phone Number: (928) 821-5830
NPS Montezuma Castle Website: https://www.nps.gov/moca/index.htm
We are MTE!
Multicultural Technical Engineers
Fahad Alkhaldi
Major: Civil Engineering
Email: fqa2@nau.edu
Brian Hernandez-Ng
Major: Civil Engineering
Email: blh275@nau.edu
Rae Johnson
Major: Civil Engineering
Email: rnj26@nau.edu
Jacob Robinson
Major: Civil Engineering
Email: jjr286@nau.edu
Andrew McLaughlin
Major: Civil Engineering
Email: ajm692@nau.edu
Cayla Washington
Major: Civil Engineering
Email: cw795@nau.edu
Page Last Updated: November 30, 2017