Grand Canyon High School Retaining Wall Redesign
Grand Canyon High School (GCHS) has a retaining wall that is in a state of failure. The wall is constructed out of railroad ties and is failing due to excessive moisture. Our capstone team has been requested to create a new design for this wall that will function for years to come and adhere to all codes and regulations that are necessary for design. These regulations pertain to construction codes as well as historical preservation policies that are required for the area.
Team Members
Emory Chamberlain
Major: Civil Engineering
Email: eec93@nau.edu
Design Analyst
Kurtis Chivens
Major: Civil Engineering
Email: kpc74@nau.edu
Surveyor
Spencer Floyd
Major: Civil Engineering
Email: saf277@nau.edu
Lab Manager
Josh Madrigal
Major: Civil Engineering
Email: jmm2354@nau.edu
Drafter
Client Information
Ivan Landry
Occupation: Director of Maintenance/ Transporation/ Operations at Grand Canyon High School
Phone Number: (928) 638-2461
Email: ilandry@grandcanyonschool.org
Technical Advisor
Chun-Hsing Ho, P.E., Ph.D
Occupation: Assistant Professor at NAU College of Engineering