Preliminary Cost Analysis
Preliminary costs have been analyzed using constraints from the final design. Bid prices have been prepared using ACE construction costs and equipment usages. Shown below is the cost analysis for the recommended design for Schultz creek. Unit prices were found as;
Construction Cost Analysis Item No. Item Description Quantity Unit Unit Price Amount Excavation 1 Sutter 450 Trail Dozer 5 Day $ 570.00 $ 2,850.00 2 Takeuchi mini excavator 5 Day $ 470.00 $ 2,350.00 3 Dump Truck rental 2 Day $ 800.00 $ 1,600.00 4 Quarry stones 60 Ton $ 60.00 $ 3,600.00 5 Vegetation Maintenance 3 Year $ 1,000.00 $ 3,000.00 6 Willow transplanting 20 Willow $ 125.00 $ 2,500.00 7 Tree removal 4 Tree $ 100.00 $ 400.00 8 Native Seeding 5 Pound $ 20.00 $ 100.00 Subtotal $ 16,400.00 Contingency @ 25% $ 4,100.00 Total $ 20,500.00
The unit prices stated above were approximated using ACE construction costs, technician costs, Flagstaff Native Plant & Seed, and Cemex rock pricing. Shown above is the construction cost analysis of the final design. Shown below is the engineering cost analysis.
Thanks to NAU the engineering cost is removed due to student involement.