The propolsal for the NTS project was constructed in spring of 2013. The reuslting project constraints and criteria from the project proposal can be found below. A Link to a Pdf of the pull propolsal can also be found below.
Project Criteria:
Project Constraints:
The final report for the Nitrate Treatability Study (NTS) for domestic single family style well drinking water delivery systems can be found in the link below.The final report details the NTS project background, technology selection, synthetic water for experiments, scale up calculations, and recommended system configuration. The project shows the process of selecting a technology, applying the technology in a laboratory setting on a small scale, and providing recommended system configurations to meet the project constraints and criteria developed in the project proposal.
The appendices intended to be used as a source of information for the reader of the NTS project Final Report can be found in the list of links below.
List of Appendices for the NTS project Final Report:
Batch Experiments 2A and 2B on Shaker Table
Analyzed Sample comparison. Sample on the left contains 2 mg/L nitrate as nitrogen and the sample on the right contains 25 mg/L nitrate as nitrogen.